Basic process flow of stone floor decoration

Sep 03, 2020

The stone used on the indoor floor is generally a polished plate with a thickness of about 20 mm. There are also thin plates with a thickness of about 10 mm, which are suitable for home decoration. The size of each piece ranges from 300 mm × 300 mm to 500 mm × 500 mm. Can use thin board and 1:2 cement mortar mixed with 107 glue for paving.


  Stone floor refers to natural granite, marble, artificial granite, marble and other floors.

1. Stone floor decoration structure

  The stone used for indoor floor is generally polished board with a thickness of about 20 mm. There are also thin boards with a thickness of about 10 mm, suitable for home decoration. The size of each piece ranges from 300 mm × 300 mm to 500 mm × 500 mm. Can use thin board and 1:2 cement mortar mixed with 107 glue for paving.

2, the basic process flow of stone floor decoration

  Cleaning and finishing the base floor→leveling with cement mortar→fixing the elevation and elastic line→selecting material→soaking the board with water→installing standard blocks→paving cement mortar→paving stone→grouting→cleaning→maintenance handover.


3, construction points

  The treatment of the base layer should be clean. The unevenness should be flattened and repaired first. The base layer should be clean. There should be no mortar, especially white ash mortar, oil stains, etc., and the ground should be moistened with water.


  When paving stone and porcelain tiles, standard blocks must be placed. The standard blocks should be placed at the intersection of the cross lines and installed diagonally.


  When paving operation, each line should be hung in sequence. The stone must be soaked in water and dried in the shade and wipe the backside.


  The maintenance of stone and porcelain tile floors after paving is very important. It must be sprinkled with water 24 hours after installation, and covered with sawdust after paving.


Four, matters needing attention


(1) Before paving, try to assemble the boards, match the flowers, colors, and numbers, so that the patterns on the ground are the same.


(2) The stone must be soaked in water and dried in the shade. So as not to affect its hardening, hollowing, shelling and other problems.


(3) After the paving is completed, no one will be allowed for 3 days.