How to stick tiles on stairs

Dec 14, 2020

  1. First, we need to process the base layer of the stair wall, clean the base layer, and make sure that there is no uneven state to do the bottom ash treatment. The thickness of the bottom ash is normally about 7~12mm.

   2. In the second step, we need to pop up the horizontal and vertical control lines of the bricks               according to the size of the wall and the size of the bricks, then put the bricks in clean water and         soak for 2 to 3 hours before taking them out, and use cement mortar Bonding.

  3. Finally, within 4 hours after the paving is completed, the cement dirt on the surface of the tiles          needs to be cleaned up, and the ash on the surface of the tiles also needs to be cleaned up. The          gaps  between the tiles can be made using the beautiful seam process. For decoration, it will form a    perfect tile paving process.