Steps for paving bluestone slabs in scenic spots
Aug 16, 2020
Bluestone paving steps:
1, elastic line
In order to control the position of the granite slab and bluestone slab, pull the cross control line within the area of the pavement zone and bounce it on the concrete cushion, then find the surface elevation based on the +50cm elevation line of the board surface, and then pop up the horizontal elevation line on the board .
2, trial run
Pave two dry sand roads in two mutually perpendicular directions including , the width of which is greater than the width of the slab, and the thickness is not less than 3cm. Combine the large-scale construction drawing and the actual size of the landscape paving partition, arrange the paving panels to check the gaps between the panels, and check the gaps between the panels and the walls, columns, openings, tree pools, side stones, flat edges, etc. relative position.
3, brush cement slurry and spread mortar leveling layer
After trial paving, remove the sand and slabs, clean them up, moisten them with a watering can, and brush a layer of plain cement slurry (water-cement ratio is 0.4-0.5, do not brush the area too large, brush with the mortar). According to the level of the board surface and the thickness of the mortar leveling layer required by the design, draw the cross control line. Begin to pave the leveling layer dry hard cement mortar (use 1:2.5 dry hard cement mortar, the dry hard degree should be kneaded into a mass by hand, and it is appropriate to disperse on the ground), and the thickness should be controlled when the bluestone slab is placed above the surface level. 4mm. After paved, use a small bar to level it, and then use a trowel to slap it down (the area of the paving should not be too large).
4. Paving slabs
Slabs should be soaked with water first, and can be laid after being wiped or the surface is dry. According to the cross control line drawn in the paving area, pave one row vertically and horizontally to serve as a large-area paving standard. According to the number and pattern during the trial assembly and the gap during the trial arrangement (the width of the gap between the plates, when the design is not specified, it should not be greater than 1mm), start paving at the intersection of the cross control lines. Try to pave first, then lift the board to align the vertical and horizontal control lines and lay it on the laid dry hard mortar leveling layer, and hit the wooden backing board with a rubber hammer (not directly hit the board with a rubber hammer or wooden hammer) to make it firm After the mortar reaches the laying height, lift the plate and move it aside, check whether the surface of the mortar and the plate are consistent. If there is any vacancy, apply the mortar to fill it, and then formally inlay and pour a layer on the cement mortar bonding layer. The plain cement slurry with a water-cement ratio of 0.5 (pour evenly with a grout pot), and then lay the plates. When placing them, the four corners will fall down at the same time. Use a rubber hammer or a wooden hammer to lightly hit the wooden backing plate, and level it with an iron level according to the horizontal line. The first piece is laid sequentially to the sides and back. After the vertical and horizontal paving, there are standards, which can be paved in sections.
5, filling, wiping
After the slabs are laid, grouting and wiping are carried out for 1 to 2 days and nights. According to the color of the paving material, choose the same color mineral pigment and cement (or white cement) to mix evenly, adjust to a 1:1 thin cement slurry, and slowly pour into the gap between the plates with a grout pot (can be divided into several times) , And use a long scraper to scrape the outflowing cement slurry into the gap until it is basically filled. After grouting for 1 to 2 hours, wipe the seam with the original thin cement slurry and smooth the surface of the board with a cotton yarn ball, and at the same time wipe the surface of the board with the grout to make the surface of the bluestone board clean, flat and solid. After the above procedures are completed, The surface layer is covered.