Stone calculation method

Nov 18, 2020

(1) Most domestic stones have a fixed width of 60.70.80 cm, and the price is calculated in meters;


(2) Most of the imported stones are large versions, and the price is calculated by square. (But some imported granites are also calculated by meters, such as imported black sands, etc.)


(3) If the window sill or the place where the stone is to be installed is irregular (such as rhombus, triangle, circle, etc.), the material used is calculated as the material consumed (the longest × widest), and the loss of 3 cm should be added to the two sides. , Are larger than the actual size;


(4) The cost of stone is composed of several major parts: material fee + processing fee (edge grinding, corner cutting, digging, hanging edge) + installation fee + transportation fee + upstairs fee.


(5) Now there is another trimming fee in the processing fee in the market. Their explanation is that the cost of cutting the material from the big slab is unreasonable and cannot be collected (of course we do not have Charge). Be sure to read it clearly when ordering.


(6) If it is an under-counter basin opening, the processing fee is calculated separately for each basin, generally around 45 yuan.