Construction Technology Of Microcrystalline Stone Dry Hanging

Sep 21, 2020

1. Backbolt dry hanging


1. All the microcrystalline stones for dry hanging are cut in the factory after drilling, and all the aluminum alloy outer buckle grooves are also processed in the factory. After passing the quality inspection and packaging, they are shipped to the construction site and guided by professional technicians on the construction site. The construction personnel install the aluminum alloy outer buckle groove on the microcrystalline stone cut after laying.


2. At the same time, the construction staff shall locate and mark the wall according to the designed plan, and install the vertical keel and aluminum alloy inner buckle groove.


3. Hang the microcrystalline stone with the aluminum alloy outer buckle groove on the aluminum alloy inner gold groove, use fine-tuning bolts to level and position, and hang other microcrystalline stones accordingly (consider the need for maintenance and replacement, It is recommended that the line spacing between the crystallites is not less than 10mm).


4. If there are gaps between the crystallites, it is advisable to use glass glue of suitable color to fill the gaps according to the needs of the design.

20190705144655586610

Second, buckle groove dry hanging


1. Slot the side of the microcrystalline stone according to the needs of the design.


2. At the same time, mark the mark on the wall according to the design needs, fix the corner plate coated with protective paint on the wall with expansion bolts, drill holes on the corner plate according to the design needs, and install it with bolts Tooth plate.


3. Put the slotted groove on the microcrystalline stone on the buckle, from bottom to top, install the buckle plate and the grooved microcrystalline stone layer by layer.


 4. It is recommended to leave a gap of 5-10mm between the crystallites and seal them with glass glue.


5. The buckle plate must be processed accurately, especially to ensure the verticality, otherwise it is easy to crack the wall.


 6. The tooth plate and the installation groove must be firmly bonded with stone glue.